|
Living Word Church, Phase Four: At this point the new sanctuary is construction with more seating, additional parking, offices and a green room. Depending on the size of the congregation this phase can be scaled up or
down. It can be made as a simple shell or it can be built on a stemwall.
A stemwall adds costs with little justification other than it is more
appealing to some congregations. A stemwall does make door and window
installation easier.
|